Halo Tech were engaged by Orica Yarwun to undertake the Demolition of their Redundant Chlorine Manufacturing Plant.

This work was very high risk given the nature of the hazardous chemical once used in this process. The demolition works consisted of all classes of demolition – Mechanical Equipment, Electrical Services, Major Steel Structures and Concrete.

The project was carried out over the span of 18 months injury free.
Approx. Demolition – 150 metric Tonnes